Sungai Kenau Flood Mitigation
Flood MitigationJB31In Progress

Sungai Kenau Flood Mitigation

Kuantan, Pahang, MalaysiaAwarded 2023

Project Description

The Sungai Kenau Flood Mitigation project at Pekan Sungai Lembing in Kuantan, Pahang is a critical infrastructure initiative designed to protect local communities from recurring flood events. The project involves comprehensive flood control measures including river widening, embankment construction, and water retention systems to manage monsoon-season flooding in this historically flood-prone area.

Key Features

Protection for Sungai Lembing heritage town
Integrated flood management approach
Climate-resilient infrastructure design
Community safety and livelihood protection

Project Information

Contract Awarder
Bridgex Sdn Bhd
Location
Kuantan, Pahang, Malaysia
Year Awarded
2023
Category
Flood Mitigation
Status
In Progress

Technical Details

River Length~8 km
Embankment HeightUp to 6m
Retention Capacity500,000 m³
Contract Period36 months
StatePahang
DistrictKuantan

Scope of Works

1
River widening and deepening works
2
Flood embankment construction
3
Water retention pond construction
4
Drainage channel improvements
5
Riverbank protection and stabilization
6
Pump station and control structures

Project Milestones

2023

Contract Award

Awarded by Bridgex Sdn Bhd

2024

River Works

River widening and embankment construction

2025

Retention Systems

Water retention pond completion

2026

Completion Target

System testing and handover

Project Photos

Related Projects

Central Spine Road (CSR) Package 4
Highway

Central Spine Road (CSR) Package 4

Pahang, Malaysia
Kampung Badlishah Road
Highway

Kampung Badlishah Road

Kulim, Kedah, Malaysia
Kota Tinggi-Mersing Road Elevation
Highway

Kota Tinggi-Mersing Road Elevation

Johor, Malaysia

Interested in Our Capabilities?

Contact us to discuss how BBSB International can deliver your next infrastructure project.