The Central Spine Road (CSR) Package 4 is a critical segment of the national highway network connecting the east coast of Peninsular Malaysia. This package covers the Benta Bypass section from Ladang Jerkoh to Sega Lama, involving complex terrain and challenging geological conditions. BBSB International is responsible for the complete construction including earthworks, road pavement, drainage systems, and multiple bridge structures along the corridor.
Project awarded by Teras Sari Resources Sdn Bhd
Commenced earthworks and site preparation
Structural works for bridge crossings underway
Pavement and surfacing works in progress